Article
Publication date: 27 August 2020

D.C. Sirimewan, A.P.K.D. Mendis, Damitha Rajini, Aparna Samaraweera and Naiduwa Handi Chathuri Manjula

Sustaining the irrigated agriculture, while conserving the natural eco-system, are the two main objectives of sustainable water management (SWM) in irrigation. Achieving both the…

Abstract

Purpose

Sustaining the irrigated agriculture, while conserving the natural eco-system, are the two main objectives of sustainable water management (SWM) in irrigation. Achieving both the objectives simultaneously is a complex task in most developing countries. This requires a holistic approach of understanding the issues in irrigation water management (IWM) from social, economic and environmental perspectives. Therefore, this paper aims to analyse the issues towards the SWM of irrigation systems in Sri Lanka to help maintain a stable relationship between the aforementioned two objectives.

Design/methodology/approach

Qualitative interview survey was selected as the research strategy to achieve the research aim. 16 semi-structured interviews were conducted with experts in IWM sector to collect data in the Sri Lankan context. Data were analysed using code-based content analysis, based on directed approach.

Findings

Findings revealed the issues in SWM in terms of efficiency of irrigation infrastructure; equity of water distribution; environmental integrity and economic acceptability. Most of the issues were related to the inefficiency towards SWM of irrigation systems. Conflicts among water users, especially the people in downstreams aggravated the problem of equity of water sharing. Depletion of groundwater and waterlogging were the major issues towards environmental integrity. Loss of water happened due to the issues in different irrigation infrastructure components hindering economic acceptability.

Originality/value

Theoretical contribution includes an analysis of issues in IWM from a sustainability perspective. Practical implications include an overview of deficiencies in the SWM to generate appropriate strategies to achieve sustainability for decision-makers such as policymakers in the irrigation sector in developing countries similar to Sri Lanka.

Details

Built Environment Project and Asset Management, vol. 11 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 20 January 2021

B.A.K.S. Perera, D.C. Sirimewan and A.D. Senadeera

Many public-sector building projects in developing countries are prone to variations owing to the changes made to their original project scopes, and economic depressions and…

Abstract

Purpose

Many public-sector building projects in developing countries are prone to variations owing to the changes made to their original project scopes, and economic depressions and stagnations. Cost and time-overruns are consequences of such variations. Thus, variation management in these projects is important. Hence, this paper aims to analyse the methods of managing variations in public-sector building projects in Sri Lanka.

Design/methodology/approach

The study adopted a mixed research approach. Seventeen expert interviews and a questionnaire survey were conducted to identify the causes and consequences of the variations, and the strategies that will help manage those variations. Manual content analysis and mean weighted rankings (MWR) were used to analyse the collected quantitative and qualitative data, respectively.

Findings

The employer, consultant, contractor and several other factors are mostly responsible for the variations in public-sector building projects in Sri Lanka. Cost and time-overruns, rework and demolition and disputes are the major consequences of such variations. The study findings reveal that a detailed employer’s brief, clearly defined project objectives, a comprehensive design and set of specifications, and preliminary investigations are the strategies that will mostly minimise the variations in public-sector building projects in Sri Lanka.

Originality/value

The study proposes strategies to avoid or minimise the adverse impact of variations, which the industry practitioners can adopt for variation management in public-sector building projects. The study theoretically contributes to knowledge by revealing how variations in public-sector building projects in Sri Lanka can be managed by identifying their causes and consequences.

Details

Journal of Engineering, Design and Technology , vol. 19 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 November 2021

DC Sirimewan, Aparna Samaraweera, NHC Manjula, Raufdeen Rameezdeen, MNN Rodrigo and EMAC Ekanayake

Irrigation System Management (ISM) poses many issues in terms of social and technical aspects. These can be further elaborated as the issues toward the efficiency of…

Abstract

Purpose

Irrigation System Management (ISM) poses many issues in terms of social and technical aspects. These can be further elaborated as the issues toward the efficiency of infrastructure, equity of water sharing, environmental integrity and economic acceptability. Water losses and the structural changes of the system caused many issues putting the irrigation system into distress. Hence, this urges the need for sustainable ISM to improve social and technical attributes in ISM. This paper aims to apply the Socio-Technical Systems (STSs) theory for sustainable ISM.

Design/methodology/approach

The qualitative expert opinion survey method was selected as the research strategy to approach the research aim. Sixteen industry professionals in the ISM sector were selected through the purposive sampling method to conduct semi-structured interviews to collect data in the Sri Lankan context. Code-based content analysis through a directed approach was used to analyse the data.

Findings

Four main categories of strategies were emerged from the research findings as “engineering strategies”, “operational strategies”, “management strategies” and “regulatory strategies” through STS approach for sustainable ISM. The STS framework was developed by combining engineering and operational strategies into the technical subsystem and the management and regulatory strategies into the social subsystem to approach the aim of achieving contemporary system management in irrigation in a sustainable manner.

Originality/value

The research revealed the links between the strategies emerged from various disciplines to minimise the issues in ISM from the perspectives of technical and social subsystems. The study contributes to knowledge by providing a framework for sustainable ISM by applying the socio-technical systems theory by integrating the concepts of sustainability.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 February 2022

Isuri Anuradha Amarasinghe and Chandanie Hadiwattege

Despite the desire to improve the sustainability of the construction industry, Sri Lanka is still plagued by the low-level adoption of essential methods such as Life Cycle…

Abstract

Purpose

Despite the desire to improve the sustainability of the construction industry, Sri Lanka is still plagued by the low-level adoption of essential methods such as Life Cycle Assessment (LCA) in building and infrastructure delivery. It is indispensable to investigate enablers for facilitating LCA because identification of enablers is a crucial step in the implementation of LCA. This study aims to analyze internal and external enablers for facilitating LCA for the Sri Lankan construction industry from the perspective of five stakeholder categories (academia, government, construction industry, society and environmentalists) and also aims to develop strategies to strengthen the enablers.

Design/methodology/approach

An explanatory research design was used. The five stakeholder categories identified above, whose contribution is essential for implementing LCA in Sri Lanka, were selected for data collection. A total of 20 semi-structured interviews were held representing each stakeholder category. The Repertory Grid Interview (RGI) technique was utilized and data analysis was performed using content analysis.

Findings

The results revealed that “ability to identify opportunities for environmental improvements as an extremely important internal enabler for all stakeholder categories” and “the positive growth in the country to achieve environmental sustainability”, “the availability of standardized LCA guides and handbooks” as extremely important external enablers for all stakeholder categories for facilitating LCA in the Sri Lankan construction industry. Further, strategies including making people aware of the LCA concept and development of the LCA database, etc. were proposed to strengthen the enablers.

Practical implications

Knowledge generated through this study would enable the abovementioned stakeholders to make informed decisions to promote the implementation of LCA in the Sri Lankan construction industry. Further, the results of this study have raised awareness of the issues that Sri Lanka will need to solve to expand the LCA applications.

Originality/value

So far, research on LCA has not looked into enablers that can facilitate the implementation of LCA in the Sri Lankan construction industry. This research provides a comprehensive view of the internal and external enablers for facilitating LCA from the perspective of five stakeholder categories and identifies enablers that led the abovementioned stakeholders to pursue the implementation of LCA in the Sri Lankan construction industry. The study also proposes strategies for strengthening the enablers.

Details

Built Environment Project and Asset Management, vol. 12 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 18 September 2023

Mohammad Mayouf and Ciaran Gilligan

In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered…

Abstract

Purpose

In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project.

Design/methodology/approach

An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor.

Findings

The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects.

Originality/value

The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 8 January 2024

Kavita Bhangale, Kanchan Joshi, Ruchita Gupta and Bhaskar Gardas

Project complexity (PC) governs project success, but the project management literature primarily focuses on performance measures and rarely examines the complexity factors…

Abstract

Purpose

Project complexity (PC) governs project success, but the project management literature primarily focuses on performance measures and rarely examines the complexity factors, especially for megaprojects. This paper aims to determine the most significant complexity factors for the railway megaprojects in India.

Design/methodology/approach

A mixed approach using the Delphi and best–worst method (BWM) helped to identify, validate and determine the most critical factors that require intervention to diminish variance from project performance.

Findings

The BWM resulted in stakeholder management, followed by organizational and technological complexity as significant complexity factors, and the varied interests of the stakeholder as the most important among the 40 subfactors.

Practical implications

The finding indicates the necessity for strategic, tactical and operational-level interventions to effectively manage the complexity affecting project efficiency because of the varied stakeholders. This paper will guide the project and general managers to prioritize their resources to handle complexity for effective project performance measured in terms of time, cost and quality and help them make strategic decisions. The research findings of this study are expected to help researchers and practitioners in better planning and smoother execution of projects. In addition, this study would help the researchers formulate policies and strategies for better handling of the projects.

Originality/value

This study adds significant value to the body of knowledge related to PC in megaprojects in developing countries. The result of the investigation underlined that nine complexity factors and seven unique subfactors, namely, the sustainable environment, timely availability of information, communication in both directions, interdepartmental dependency and coordination, design, statutory norms, site challenges, socioeconomic conditions, the tendency of staff to accept new technology and the frequent changes in the requirements of stakeholders are significant in railway megaprojects. The BWM is applied to rank the complexity factors and subfactors in the case area.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 8 November 2022

Ahmad Shah Kakar, Abid Hasan, Kumar Neeraj Jha and Amarjit Singh

The Afghan construction industry faces resource shortages and heavily relies on foreign aid to fund public projects on the path to recovery and reconstruction. While the resource…

Abstract

Purpose

The Afghan construction industry faces resource shortages and heavily relies on foreign aid to fund public projects on the path to recovery and reconstruction. While the resource constraints demand cost-efficient delivery of construction projects, many Afghan public projects experience delays and cost overruns. This study aims to evaluate various attributes and factors influencing cost performance in public construction projects in Afghanistan.

Design/methodology/approach

The literature review and Delphi method identified 30 cost performance attributes relevant to the context of Afghanistan. Next, a questionnaire survey was conducted with construction management professionals working in the public sector in the Afghan construction industry to evaluate these attributes.

Findings

This study found that the lack of resources, poor project management skills and corruption in procurement are the leading causes behind cost overruns in Afghan public projects. This study also identified five latent factors influencing cost performance in public projects in Afghanistan: competency of the project team, socioeconomic and political support, governance and public procurement, planning and risk management and project characteristics.

Research limitations/implications

The exploratory factor analysis did not reveal the relative significance of different cost performance success factors. Moreover, the ranking of cost performance attributes is based on the responses from the public sector construction professionals only.

Practical implications

The construction industry in Afghanistan significantly contributes to the country’s social and economic growth and employment. This study’s findings will help researchers, project sponsors, government departments and industry practitioners interested in improving the cost performance in Afghan public projects.

Originality/value

Given the scarcity of research in war-affected and conflict-sensitive regions, this study fills a research gap on project cost performance by providing insights into the cost performance success factors in public projects in Afghanistan.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 29 March 2023

Minh Van Nguyen

This study aims to (1) develop a structural equation model in understanding the relationships between corporate social responsibility (CSR) performance and contractor…

Abstract

Purpose

This study aims to (1) develop a structural equation model in understanding the relationships between corporate social responsibility (CSR) performance and contractor competitiveness and (2) test the moderating effect of firm sizes on this relationship.

Design/methodology/approach

A literature review showed an urgent need to investigate the relationship between CSR implementation and contractor competitiveness holistically. CSR and contractor competitiveness variables were identified through the literature review and discussions with experienced professionals. Using a survey questionnaire, a total of 252 completed questionnaires were received. A structural equation modeling technique was then applied to analyze the data collected. Multigroup analysis was employed to test the moderating effect of firm sizes on the relationship between CSR implementation and contractor competitiveness.

Findings

The results indicated a strong relationship between CSR implementation and contractor competitiveness. This relationship is not moderated by firm size.

Originality/value

This research is one of the first studies to holistically explore the linkages between CSR implementation and contractor competitiveness. The findings can be served as a solid foundation to promote CSR performance in construction firms. Contractors of different sizes are suggested to implement CSR activities to foster competitiveness.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Article
Publication date: 21 October 2021

Menaha Thayaparan and Andrew Ross

317

Abstract

Details

Built Environment Project and Asset Management, vol. 11 no. 4
Type: Research Article
ISSN: 2044-124X

Article
Publication date: 6 February 2024

Luwei Zhao, Qing’e Wang, Bon-Gang Hwang and Alice Yan Chang-Richards

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification…

Abstract

Purpose

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification (MICMAC) to investigate the influencing factors of sustainable infrastructure vulnerability (SIV).

Design/methodology/approach

(1) Literature review and case study were used to identify the possible influencing factors; (2) a semi-structured interview was conducted to identify representative factors and the interrelationships among influencing factors; (3) ISM was adopted to identify the hierarchical structure of factors; (4) MICMAC was used to analyze the driving power (DRP) and dependence power (DEP) of each factor and (5) Semi-structured interview was used to propose strategies for overcoming SIV.

Findings

Results indicate that (1) 18 representative factors related to SIV were identified; (2) the relationship between these factors was divided into a five-layer hierarchical structure. The 18 representative factors were divided into driving factors, dependent factors, linkage factors and independent factors and (3) 12 strategies were presented to address the negative effects of these factors.

Originality/value

The findings illustrate the factors influencing SIV and their hierarchical structures, which can benefit the stakeholders and practitioners of an infrastructure project by encouraging them to take effective countermeasures to deal with related SIVs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988